System Implementation and Deployment Preparation: Difference between revisions

From HelpWiki Highnix
Jump to navigation Jump to search
Line 5: Line 5:
# Highnix will install the application, apply the license, configure the system, and set up an empty database with some preset default values.
# Highnix will install the application, apply the license, configure the system, and set up an empty database with some preset default values.
# The user should go through the steps as listed in the link below after the system is configured by Highnix (see the step above):
# The user should go through the steps as listed in the link below after the system is configured by Highnix (see the step above):
## [[Data Migration and Initial Setup#When A New Accounting System Is Setup, How Do I Start To Use the System and How To Transfer My Account Balance From My Old System To The New One?]]
## [[Data Migration and Initial Setup]]
# Once the setup data is complete, perform a backup: [[System Setup#Backup and Restore]]
# Once the setup data is complete, perform a backup: [[System Setup#Backup and Restore]]
# Proceed to the next step: [[System Implementation and Deployment Preparation#Master Data Preparation and Migration]]
# Proceed to the next step: [[System Implementation and Deployment Preparation#Master Data Preparation and Migration]]

Revision as of 11:43, 25 June 2025


Steps Overview

This guide will walk you through the key stages of implementing and deploying the Highnix ERP system. The process includes Master Data preparation, migration, and General Ledger (GL) setup. Following the outlined steps ensures a smooth transition from your existing system to Highnix ERP.

  1. Highnix will install the application, apply the license, configure the system, and set up an empty database with some preset default values.
  2. The user should go through the steps as listed in the link below after the system is configured by Highnix (see the step above):
    1. Data Migration and Initial Setup
  3. Once the setup data is complete, perform a backup: System Setup#Backup and Restore
  4. Proceed to the next step: System Implementation and Deployment Preparation#Master Data Preparation and Migration
  5. Perform another backup to save the data you have just updated.
  6. Perform the data migration per the steps below.
  7. Once these are done, the system is ready to be used.

Default Account Codes and System General GL Setup

Please refer to this link for the setup: System Setup#Default Account Codes and System General GL Setup